Transport frame Flange Pile Upending Tool

Project Description

Goal: Design a transport frame for the new 1600t Flange Pile Upending Tool (FPUT). The transport frame needs to have a retractable service platform.

Result: The designed transport frame is suitable for any size in which the FPUT is build up. The FPUT is modified to suit the project pile size. The transport frame is provided with a ladder and a retractable service platform that is used to do maintenance on the FPUT.

Project Details

Client: IHC IQIP

Year: 2016